What-if Analysis
Adjust any scope and watch the effect on cost and margin update live.
Only analytics-ready projects with complete cost and floor-area data can be used for What-if Analysis.
Something went wrong while contacting the server.
This project doesn't have scope-level cost data to build a scenario from.
Current Scenario
Adjust any scope below to see the effect on total cost, cost per m², and margin.
| Metric | Original | Scenario | Impact |
|---|
Scenario Adjustments
Every cost scope for this project is listed below. Adjust any row - changes apply automatically. Positive values increase cost, negative values reduce it (-100% to +500%).
Original vs Scenario Total Cost
Margin Before vs After
Scope Cost Impact
Cost difference introduced by each adjusted scope. Increases extend right, decreases extend left.
Adjust one or more scopes to see their cost impact.
Original vs Adjusted Scope Costs
Scenario Cost Distribution
A separate chart from the Project Analysis Cost Distribution - this one reflects the current scenario.
Adjustment Detail
Exact figures confirmed by the server for every adjusted scope.
| Scope | Original | Change | Adjusted | Impact |
|---|